From the latest financial information to scholarship applications, you'll likely find the documents you need in the list below. If you don't, please contact us.
 

Bluebonnet's Member Handbook

English 
Español

Bluebonnet's Condensed Financial Reports

2020
2019
2018
2017
2016
2015

Tariffs and Bylaws

Tariff Manual Table of Contents
Tariff Manual Section 1—Utility Operations
Tariff Manual Section 2—Rate Schedule
Tariff Manual Section 3—Service Rules and Regulations
Tariff Manual Table of Contents (Espanol)
Tariff Manual Section 1—Utility Operations (Espanol)
Tariff Manual Section 2—Rate Schedule (Espanol)
Tariff Manual Section 3—Service Rules and Regulations (Espanol)

Bluebonnet's Bylaws Amendments
Bluebonnet's Bylaws Index
Bluebonnet's Bylaws
Bluebonnet's Bylaws Amendments (Espanol)
Bluebonnet's Bylaws Index (Espanol)
Bluebonnet's Bylaws (Espanol)

Board Agendas and Annual Meeting Minutes

2022 board meeting schedule

2022 Board Agendas

January 18
Please check back on the Friday before the next meeting for the agenda.

2021 Board Agendas
January 19
February 23
March 16
April 20
May 11
June 22
July 20
August 17
September 21
October 19
November 19
December 21

2021 Committee Agendas
Audit & Finance Committee Agenda April 20

Annual Meeting Minutes
2021 Annual Meeting
2020 Annual Meeting
2019 Annual Meeting

Rates & Billing

Residential Rate
Commercial Rates
Renewable Energy Rate
Green Energy Rate
Understanding Your Bill  
Understanding PCRF

General Information

2021 Scheduled Holiday Office Closings  Español
2022 Scheduled Holiday Office Closings  Español
Houston Toad and Bluebonnet Territory Map
Member Agreement (Sample)
Member Agreement in Spanish (Sample)
Tax Credits
Texas Weatherization Assistance Program
Bluebonnet Terms of Use

Subdivisions and Commercial Development

Contribution in Aid of Construction (CIAC) Refund Form  Español
Refund Request Requirements
Residential Developers Packet
Commercial Developers Packet
Easement Form  Español
Commercial Load Sheet
Residential Load Sheet

Meter Loop Specifications, Line Extensions

(last updated 12/26/2021)

If you have any questions about the Meter Loop Specifications or Line Extension forms, please contact Bill Scoggins at bill.scoggins@bluebonnet.coop.

Overhead:

(MS-102) Single Phase or Three Phase, 60-200 Amp Meter Loop on Transformer Pole
(MS-103MT) Single Phase or Three Phase, 60-200 Amp Meter Loop on Building
(MS-103WT) Single Phase or Three Phase, 60-200 Amp Meter Loop on Building Wall Type
(MS-105) Single Phase or Three Phase, 60-200 Amp Multiple Meters on Rack or Building not to Exceed a Total of 800 Amps
(MS-106) Single Phase or Three Phase, 60-200 Amp Meter on Building
(MS-107MT) Single Phase, 400 Amp Service with Meter Loop on Building - Mast Type
(MS-107WT) Single Phase, 400 Amp Service on Building Wall Type
(MS-108) Single Phase, 400 Amp Service on Meter Rack or Building with K Base Bolted In Meter Socket
(MS-112B1) Single Phase greater than 400-600 Amp, Service on Building with CT Metering on Building or Rack
(MS-112B3) Three Phase greater than 200-600 Amp, Service on Building with CT Metering on Building or Rack
(MS-113B1) Single Phase greater than 400-800 Amp Service with CT Metering on Rack
(MS-113B3) Three Phase greater than 200-800 Amp Service with CT Metering on Rack
(MS-114A1) Single Phase  400-800 Total Amps, Multiple Metering Points on Building (Riser Type)
(MS-114B3) Three Phase  200-800 Amps Total with Multiple Metering Points on Building (Riser Type)
(MS-115-1) Single Phase 400-800 Total Amps with Multiple Metering Points on Building Service Type
(MS-115-3) Three Phase 200-800 Total Amps with Multiple Metering Points on Building Service Type
(MS-301A) Three phase 480 volt 3W Corner Ground Delta 60-200 Amps
(MS-301B) Three phase 480 volt 3W Corner Ground Delta greater than 200 Amps
(MS-302) Temporary Meter Loop for Underground
(MS-303) Single or Three Phase 60-200Amp Temporary Meter Loop for Transformer and Service Poles
(MS-10115) 15' Meter Loop, Single Phase or Three Phase, 60-200 Amp Meter Loop on Meter Pole
(MS-10119) 19' Meter Loop, Single Phase or Three Phase, 60-200 Amp Meter Loop on Meter pole

Underground:

(MS-201) Single Phase or Three Phase, 60-200 Amp URD Service on Rack or Building
(MS-202A1) Single Phase Greater than 400 Amp, Underground with Multiple Metering Point on Building
(MS-202B3) Three Phase Greater than 200 Amp, Underground with Multiple Metering Points on Building
(MS-203) Single Phase, 400 amp URD Service on Rack or Building with K Base Bolted In Meter Socket
(MS-204A3) Three Phase Greater than 200 Amp URD Service on Rack or Building
(MS-204B1) Single Phase Greater than 400 Amp with CT Metering on Building
(MS-204B3) Three Phase Greater than 200 Amp with CT Metering on Building
(MS-205) Single Phase or Three Phase, 60-200 Amp URD Gang Mounted Meters on Rack or Building
(MS-207) Single Phase, 60-200 Amp URD Multi-Pack Meters on Building
(MS-207B) Three Phase 60-200 Amp URD Multi-Pack Meters & Three Phase Less or Greater Than 200 Amp Service on Building

Standby Generation:
 
(MS-401) 60-200 Amp, Single Phase Overhead Service to a Standby Generator System With Meter on Rack or Building
(MS-402) 60-200 Amp, Single Phase Underground Service to a Standby Generator System with Meter on Rack or Building
(MS-403) 400 Amp, Single Phase Overhead Service to a Standby Generator System with Meter on Rack or Building with K Base Bolted Meter Socket
(MS-404) 400 Amp, Single Phase Underground Service to a Standby Generator System with Meter on Rack or Building with K Base Bolted Meter Socket
(MS-405) Single Phase Greater than 400-800 Amp or Three Phase Greater than 200-800 Amp Overhead Service with CT Metering on Pole with Standby Generator
(MS-406) Single phase greater than 400 amp or three phase greater than 200 Amps Underground Service with Disconnect Rack or Building with Standby Generator
(MS-407) Single Phase 60-200 Amp Existing Overhead Service with Underground Standby Generator System with Meter on Rack or Building
(MS-408) Single Phase 60-200 Amp Existing Underground Service to a Underground Standby Generator System with Meter on Rack or Building

Renewable Interconnection:

(MS-501) Renewable Interconnection Less Than 50 kW At Meter Pole With Back-Feed Breaker
(MS-502) Renewable Interconnection Less Than 50 kW At Meter Pole With Line Side Tap
(MS-507T) Renewable Interconnection Less Than 50kW At Meter With Tesla Disconnect Collar Backup Switch
(MS-553-1) Renewable Single Phase greater than 50 kW, greater than 200 Amp, 400-800 Amp Service with CT Metering on Rack
(MS-553-3) Renewable Three Phase greater than  50 kW, greater than 200 Amp, 400-800 Amp Service with CT Metering on Rack
(MS-554-1) Renewable Single phase greater than 50 kW, greater than 200 amp Underground Service with CT Metering on Disconnect Rack or Building
(MS-554-3) Renewable Three phase greater than 50 kW, greater than 200 amps Underground Service with CT Metering on  Disconnect Rack or Building