Reports and forms
Find the documents you need for doing business with Bluebonnet.
From the latest financial information to meter specifications, you'll likely find the documents you need in the list below. If you don't, please contact us.
January 16
February 20
March 19
April 16
May 14
June 25
July 16
August 20
September 17
October 15
November 22
Please check back on the Friday before the next meeting for the agenda.
Contribution in Aid of Construction (CIAC) refund form for electric service built before July 2023Spanish
CIAC refund form for electric service construction after July 2023 Spanish
CIAC refund request requirements
Residential Developers Packet
Commercial Developers Packet
Easement form Spanish
Commercial load sheet
Residential load sheet
(MS-102) Single phase or three phase, 60-200 amp meter loop on transformer pole
(MS-103MT) Single phase or three phase, 60-200 amp meter loop on building
(MS-103WT) Single phase or three phase, 60-200 amp meter loop on building wall type
(MS-105) Single phase or three phase, 60-200 amp multiple meters on rack or building not to exceed a total of 800 amps
(MS-106) Single phase or three phase, 60-200 amp meter on building
(MS-106A) Single phase for three phase, 60-200 amp meter on building or rack
(MS-107MT) Single phase, 400 amp service with meter loop on building - mast type
(MS-107WT) Single phase, 400 amp service on building wall type
(MS-108) Single phase, 400 amp service on meter rack or building with k base bolted in meter socket
(MS-112B1) Single phase greater than 400-600 amp, service on building with CT metering on building or rack
(MS-112B3) Three phase greater than 200-800 amp service with CT metering on rack
(MS-113B1) Single phase greater than 400-800 amp service with CT metering on rack
(MS-113B3) Three Phase greater than 200-800 Amp Service with CT Metering on Rack
(MS-114A1) Single phase 400-800 total amps, multiple metering points on building (riser type)
(MS-114B3) Three phase 200-800 amps total with multiple metering points on building (riser type)
(MS-115-1) Single phase 400-800 total amps with multiple metering points on building service type
(MS-115-3) Three phase 200-800 total amps with multiple metering points on building service type
(MS-301A) Three phase 480 volt 3w corner ground delta 60-200 amps
(MS-301C) Three phase greater than 200-800 amp service
(MS-302) Temporary meter loop for underground service
(MS-303) Single or three phase 60-200 amp temporary meter loop for transformer and service poles
(MS-10115) 15 feet meter loop, single phase or three phase, 60-200 amp meter loop on meter pole
(MS-10119) 19 feet meter loop, single phase or three phase, 60-200 amp meter loop on meter pole
(MS-201) Single phase or three phase, 60-200 amp underground service on rack or building
(MS-202A1) Single phase greater than 400 amp, underground with multiple metering point on building
(MS-202B3) Three phase greater than 200 amp, underground with multiple metering points on building
(MS-203) Single phase, 400 amp underground service on rack or building with k base bolted in meter socket
(MS-204A3) Three phase greater than 200 amp underground service on rack or building
(MS-204B1) Single phase greater than 400 amp with CT metering on building
(MS-204B3) Three phase greater than 200 amp with CT metering on building
(MS-205) Single phase or three phase, 60-200 amp underground gang mounted meters on rack or building
(MS-207) Single phase, 60-200 amp underground multi-pack meters on building
(MS-207B) Three phase 60-200 amp underground multi-pack meters & three phase less or greater than 200 amp service on building
(MS-400) 60-200 amp, single phase overhead service to a standby generator system with meter on a pole
(MS-401) 60-200 amp, single phase overhead service to a standby generator system with meter on rack or building
(MS-402) 60-200 amp, single phase underground service to a standby generator system with meter on rack or building
(MS-403) 400 amp, single phase overhead service to a standby generator system with meter on rack or building with k base bolted meter socket
(MS-404) 400 amp, single phase underground service to a standby generator system with meter on rack or building with k base bolted meter socket
(MS-405) Single phase greater than 400-800 amp or three phase greater than 200-800 amp overhead service with CT metering on pole with standby generator
(MS-406) Single phase greater than 400 amp or three phase greater than 200 amps underground service with disconnect rack or building with standby generator
(MS-406A) Single phase greater than 400 amp or three phase greater than 200 amps
(MS-407) Single phase 60-200 amp existing overhead service with underground standby generator system with meter on rack or building
(MS-408) Single phase 60-200 amp existing underground service to a underground standby generator system with meter on rack or building
(MS-412) Single phase or three phase, 60-200 amp meter loop with transfer switch on a transformer pole
(MS-41115) 15 feet meter loop, single phase or three phase, 60-200 amp meter loop with a transfer switch on meter pole
(MS-41119) 19 feet meter loop, single phase or three phase, 60-200 amp meter loop with a transfer switch on meter pole
(MS-501) Renewable interconnection less than 50 kW at meter pole with back-feed breaker
(MS-502) Renewable interconnection less than 50 kW at meter pole with line side tap
(MS-507T) Renewable interconnection less than 50kW at meter with Tesla disconnect collar backup switch
(MS-553-1) Renewable single phase greater than 50 kW, greater than 200 amp, 400-800 amp service with CT metering on rack
(MS-553-3) Renewable three phase greater than 50 kW, greater than 200 amp, 400-800 amp service with CT metering on rack
(MS-554-1) Renewable single phase greater than 50 kW, greater than 200 amp underground service with CT metering on disconnect rack or building
(MS-554-3) Renewable three phase greater than 50 kW, greater than 200 amps underground service with CT metering on disconnect rack or building